Reflections on Volume

Big volume without further upside equals distribution
Big volume without further downside equals accumulation

Volume tends to peak at turning points
Volume often precedes price movement
Volume is a relative study


Showing posts with label bpuri. Show all posts
Showing posts with label bpuri. Show all posts

Tuesday, December 21, 2010

Building up to a super bull run

A super bull run is on the horizon for Malaysian construction stocks next year on optimism that the RM40 billion Mass Rapid Transit project will start in July.

The bullish outlook is also backed by new government initiatives such as the Economic Transformation Programme and the 10th Malaysia Plan, said UOB KayHian head of research Vincent Khoo.

Research houses are maintaining their overweight call on the sector.

"We expect a bull run next year," Khoo told Business Times.

An analyst from TA Research said the stock market needs news like the MRT as a catalyst for construction stocks to sustain its upbeat momentum.

He said judging from the size of the MRT project, it is certain that almost all local construction companies will benefit.

"If the government divides the project evenly, then each company could get contracts worth RM500 million to RM1 billion. This augurs well for the sector," he said.

The MRT, comprising three lines, is the largest infrastructure project in Malaysia's history. The last project announced was the RM12.5 billion double tracks.

Analysts said the first of the three MRT lines, joining Sungai Buloh and Kajang, running through Kuala Lumpur City Centre, is estimated at RM14 billion. The line will cover 60km and have 35 stations.

They said MMC-Gamuda Joint Venture Sdn Bhd may get the tunneling portion from Sungai Buloh to Kajang, worth RM6 billion to RM8 billion.

Master Builders Association Malaysia president Kwan Foh Kwai expects companies like Sunway Construction, IJM Construction, Muhibbah Engineering, Bina Puri, Loh & Loh, MRCB Engineering, UEM Builders, WCT, Ranhill and Ahmad Zaki to bid for the MRT.

Others include Eversendai Corp, Crest Builders, Putra Perdana Construction and MTD ACPI.

Ahmad Zaki managing director Datuk Wan Zakariah Muda said the MRT news is positive for the sector. "There will be spillovers and knock-on effects. We plan to participate in the MRT," he said.

An official from Putra Perdana Construction Sdn Bhd said it will eye packages to build structures, stations, bridges and tunnel lining work.

Read more

Friday, November 26, 2010

Prasarana picks TRC, Bina Puri as main contractors for LRT extension jobs

Written by Joseph Chin Friday, 26 November 2010 20:28

KUALA LUMPUR: Syarikat Prasarana Negara Bhd has picked TRC Synergies Bhd and the joint venture between BINA PURI HOLDINGS BHD [] and Tim Sekata JV as main contractors for the multi-billion-ringgit light rail transit (LRT) extension projects.

Prasarana said on Friday, Nov 26 that it had picked TRC’s unit as the main contractor for the 17 km extension of the Kelana Jaya Line from Kelana Jaya station to Putra Heights, which includes 13 new stations. The contract value is RM950 million and it is for 30 months.

It also appointed Bina Puri- Tim Sekata JV as the main contractor to implement the 17.7 km extension for the Ampang LRT line between Sri Petaling to Putra Heights with 13 new stations. The contract value is RM634.64 million and the duration is 27 months.

The announcement confirmed The Edge FinancialDaily report that Bina Puri was in the forefront to win the LRT extension job for the Ampang line worth about RM600 million.

The EdgeFD also reported TRC was tipped to bag the main contract for the Kelana Jaya line extension, estimated to be worth between RM900 million and RM1 billion.

For the Kelana Jaya line extension, Prasarana said the nominated sub-contractor for the fabrication and delivery of segmental box girder was the joint venture between UEM BUILDERS BHD [] and Intria Bina Sdn Bhd.

The contract value is RM93.16 million and the contract period is for 21 months.

As for the Ampang LRT line extension, the nominated sub-contractor for the fabrication and delivery of segmental box girder was also the joint venture between Bina Puri and Tim Sekata.

The contract value is RM67.69 million and the duration of the contract is 19 months.

“In addition, within the total contract value the main contractors will also manage the nominated sub-contractors for contracts worth RM469 million (Kelana Jaya Line) and RM305 million (Ampang Line) respectively,” Prasarana said.

It added the nominated sub-contractors, to be appointed by Prasarana through a separate on-going open tender process, would cover CONSTRUCTION [] of stations; supply and installation of escalators and lifts; and construction of multi-storey car parks.

Taken from here

Wednesday, September 8, 2010

Bina Puri to take 80% stake in RM500m Medini project

Written by Joseph Chin Tuesday, 07 September 2010 18:43

KUALA LUMPUR: BINA PURI HOLDINGS BHD [] is teaming up with Medini Land Sdn Bhd to develop 1.048 million sq ft gross floor area in Medini North, the first phase of Medini Iskandar Malaysia.

“The development will have a gross development value of approximately RM500 million upon completion of the two-phase development in Johor,” it said.

Bina Puri will have an 80% stake in the development of the project which is expected to be completed in 2012.

Extracted from...

Wednesday, June 23, 2010

15 firms attend SPNB tender briefing for LRT job

STATE-owned public transport operator Syarikat Prasarana Negara Bhd (SPNB) had called for a tender briefing yesterday for the light rail transit (LRT) line extension in the Klang Valley.
It is understood the briefing was attended by 15 construction companies to discuss the scope of works involved in the LRT extension project estimated at about RM9 billion.

SPNB invited the companies.

They include Sunway Construction Sdn Bhd, IJM Construction Sdn Bhd, Muhibbah Engineering Sdn Bhd, Gamuda Bhd, Bina Puri Holdings Bhd, Loh & Loh Corp Bhd, MRCB Engineering Sdn Bhd as well as joint-ventures such as WCT-Sinohydro, Ranhill-CCCC and UEM Builders-Intria Bina.

It is understood that the companies are expected to visit the site this Sunday, where the lines between Ampang and Kelana Jaya are to be built.

"The companies must buy the tender documents for the project by June 24. SPNB may call for tenders for infrastructure works first," a source told Business Times.

It is learnt that there will be a total of eight packages under the project, which will be tendered in stages.

These include the construction and completion of facilities work for the Ampang LRT line, and the Kelana Jaya LRT line.

The other packages are to nominate sub-contractors for fabrication and delivery of segmental box girders for both the Ampang and Kelana Jaya LRT lines.

SPNB group managing director Datuk Idrose Mohamed had recently said that 15 candidates were shortlisted for the sub-contracting of fabrication and delivery of segmental box girder works.

SPNB is raising RM4 billion from bond sales to part-finance the project, which forms part of the RM10 billion railway scheme to expand Kuala Lumpur's public transport network.

Source ...

Thursday, May 6, 2010

Bina Puri hopes to be awarded LCCT job soon

Bina Puri Holdings Bhd (5932) hopes to get the letter of award to build the main terminal and satellite building of the new permanent low-cost carrier terminal (LCCT) in Sepang, Selangor, this month.

The construction group had bid for the RM1.1 billion package in a 40:60 joint venture with UEM Group.

"We have done a lot of site preparation and believe we can finish construction in 17 months," Bina Puri group managing director Tan Sri Tee Hock Seng said after its shareholder meeting in Kuala Lumpur yesterday.

Airport operator Malaysia Airports Holdings Bhd (MAHB) had shortlisted five companies, including a tie-up between Sunway Construction Sdn Bhd and privately-held AHT Norlan-Carriage, IJM Corp Bhd and the Gadang Holdings-PPC joint venture, for the contracts.

To date, MAHB has awarded two contracts for the LCCT project.
The first, worth RM362 million, was given to WCT Bhd last December for site preparation, earthworks and main drainage. In January, a RM291 million contract was awarded to Gadang Bhd to carry out earthworks for the runway and taxiways.

Bina Puri also submitted a bid last month to build a RM150 million hotel on 2.4ha next to the LCCT. It is partnering Brem Holdings Bhd and Crystal Crown Hotels & Resorts in the bid.

The new LCCT will be 1.5km away from the KL International Airport compared with 20km for the existing LCCT.

Source

Wednesday, April 28, 2010

SunCon, WCT, Fajar, Muhibbbah pre-qualified as main contractors for LRT extensions

Written by Joseph Chin Wednesday, 28 April 2010 11:35

KUALA LUMPUR: Syarikat Prasarana Negara says 17 applicants have been pre-qualified as main contractors for the extensions to the light rail transits for the Ampang and Kelana Jaya lines.

It said on Wednesday, April 28 the applicants have demonstrated their technical and financial capacity and capability with the relevant infrastructure works experience.

They are:
1.Sunway CONSTRUCTION [] Sdn Bhd
2.Fajarbaru Builder Sdn Bhd – Signatium Construction Sdn Bhd JV
3.WCT – Sinohydro JV
4.IJM Construction Sdn Bhd
5.Ranhill – CCCC JV
6.Muhibbah Engineering Sdn Bhd
7.Gamuda Berhad
8.UEM BUILDERS BHD [] – Intria Bina Sdn Bhd JV
9.MMC- Zelan JV
10.MRCB Engineering Sdn. Bhd
11.Trans Resources Corporation Sdn Bhd
12.BPHB – Tim Sekata JV
13.Zabima – Leighton JV
14.Mudajaya Corporation Berhad
15.MTDC – Persys JV
16.Loh & Loh Constructions Sdn Bhd
17.Ahmad Zaki Sdn Bhd


In addition, 15 applicants have been pre-qualified as nominated sub-contractors for the fabrication and delivery of segmental box girder. The successful contractors will be notified officially in due course by Prasarana. The 15 are:

1.Sunway Construction Sdn Bhd
2.Fajarbaru Builder Sdn Bhd – Signatium Construction Sdn Bhd JV
3.WCT – Sinohydro JV
4.IJM Construction Sdn Bhd
5.Ranhill – CCCC JV
6.Muhibbah Engineering Sdn Bhd
7.UEM Builders Bhd – Intria Bina Sdn Bhd JV
8.MMC- Zelan JV
9.MRCB Engineering Sdn. Bhd
10.BPHB – Tim Sekata JV
11.Zabima – Leighton JV
12.MTDC – Persys JV
13.Ahmad Zaki Sdn Bhd
14.Bina Puri – Acre Works – SNC Lavalin JV
15.UEM Construction Sdn Bhd – Projek Penyelenggaraan Lebuhraya Berhad (PROPEL) JV

The financing of the project will be from Islamic bonds guaranteed by the Government. In September 2009, Prasarana had successfully launched RM4.0 billion Sukuk programme of which RM2.0 billion had been raised and oversubscribed by 5.3 times for the 15-year and 2.7 times for the 20-year tranche to part finance the line extension project. The balance of RM2.0 billion will be raised as the project implementation progresses.

Tuesday, March 23, 2010

Related Posts Plugin for WordPress, Blogger...